Performing Arts Seating and Stage is Nearing Completion

Posted by Kelcey Davis on 5/3/2021 9:00:00 AM

The Performing Arts Center is nearly complete and almost ready for students. This striking PAC will be a central part of the school and the surrounding public.  We can't wait for their first performance!

The seating and stage area is nearing completion and the following have been installed:

  • Seats
  • Handrails
  • Speakers

Lobby and Front of House (FOH)

  • The curtain wall system is installed
  • Windows at the mixing booth are installed
  • The wheelchair lift is installed in the lobby

Back of House

  • Cloud Acoustical Sound Tiles at the choir room have been installed
  • Mechanical equipment (chiller and air handling units) have been installed at the mechanical yard
  • Ceiling tiles at Levels 1 and 2 are installed

Seating at JAMS PAC